• The provision of new, centrally located, teaching accommodation over 4 levels and the construction of a new entrance for the MBC Complex, with legible access to surrounding facilities.

  • The provision of a 3 storey new build facility to link into the existing Centre for Climate, the Environment, and Chronology on a sloping urban site.

  • Internal refurbishment works to the 1st, 2nd, 3rd, 4th and 6th floors of the Ashby Tower (QUB), with upgrading of the central plant in the Basement and 11th floor plantrooms.

  • The construction of a new 3 storey South West College with an integrated 2 storey Library on a restricted site.

  • The extension to and refurbishment of the existing Coláiste Feirste (School) in Belfast.

     

  • The phased construction of a new 8 class room Integrated Primary School on the site of the existing school at Derrygore Road in Enniskillen. 

     

  • Construction of a new 8-classroom, two storey National School on a greenfield site, opposite the existing school.

  • The conversion of St Franchea's Buildings to Mount Lourdes Junior School along with refurbishment / extension works within the 'live' Mount Lourdes Grammar School Campus.